Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1890.7
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Jul 29, 2023     Avionics and Electrical - (6.3 hours)       Category: Avionics
Just met my weekly goal for the short week. We were visiting parents in San Antonio for three days.

Cut and routed wires for grounds on switches installed on the panel. Soldered wires to the timer, log event and toga switches. Soldered wires to the other side of each switch. Crimped quick connect terminals on the flap and back up enable switches.

Created a new panel ground symbol and updated 6 switches to use the panel ground instead of the avionics ground. Decided I needed to install Click Bond tie wrap pads before starting more wiring on the panel. Read up on click bond installation instructions, cleaned, scuffed and cleaned the panel locations. Mixed up CB200 adhesive and installed 8 CB9302V3 Click Bond pads. The before and after pictures below show the click bond pads with the installation fixtures still in place.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.